Key takeaways
- The route to the spot matters as much as the spot itself.
- The base is prepared before the shed arrives.
- Pre-built sheds are set in hours, and built-on-site sheds take days.
- Leveling and a door check finish the job.
The first visit
We walk the property, look at the spot, the slope, the soil and the route, and talk about size, style and extras. We measure and mark the footprint.
This is the time to ask questions and plan the schedule.
Preparing the base
We clear and grade the area and build the pad or set the blocks. The base is level, firm and drained before the shed arrives. For slabs, the concrete needs time to cure.
You do not need to be home for base work.
Delivery or build
A pre-built shed arrives on a trailer or a tilt-bed and is set in place. A built-on-site shed or a kit is framed and assembled where it stands. Either way, we protect the lawn and the driveway as much as we can.
Please clear the path of toys, hoses and cars.
Leveling and walk-through
We shim the building level, anchor it, hang and adjust the doors and clean up. Then we walk the shed with you and answer your questions.
If anything is not right, we note it and plan the follow-up.
Official sources and further reading
- Better Business Bureau
- National Association of Home Builders
- Tennessee Board for Licensing Contractors
These are independent organizations. Links open in a new tab.
Quick answers
How long does delivery take?
The set itself often takes a few hours. Base work and building take longer.
Do I need to be home?
It helps for the placement and the walk-through.